30-Day AI Mining Implementation Plan
From the course AI for Mining & Resources
A structured four-week roadmap to move from AI awareness to a working pilot in your mining operation.
Week 1: Discovery & Data Audit
Days 1-3: Stakeholder Alignment
Start with a cross-functional workshop involving operations, maintenance, geology, safety, and IT. Define the single biggest operational pain point — this becomes your pilot focus. Common high-value starting points:
- Unplanned equipment downtime (maintenance teams love this)
- Ore grade variability causing process instability (metallurgy wins)
- Truck cycle time variance (production supervisors' priority)
- Safety incident precursors (HSE buy-in is critical)
Days 4-7: Data Inventory
Audit what data you actually have and its quality:
# Data readiness checklist
data_sources = {
'dispatch_system': {'years': 5, 'completeness': '95%', 'format': 'SQL'},
'maintenance_cmms': {'years': 8, 'completeness': '78%', 'format': 'SAP'},
'process_historian': {'years': 3, 'completeness': '99%', 'format': 'OSIsoft PI'},
'drill_data': {'years': 2, 'completeness': '60%', 'format': 'CSV'},
'lab_assays': {'years': 15, 'completeness': '92%', 'format': 'LIMS'}
}
# Minimum viable dataset for each use case
predictive_maintenance_minimum = '2 years, 80%+ completeness, failure events labeled'
grade_prediction_minimum = '500+ drill holes with assays, geology logs'
dispatch_optimization_minimum = '6 months cycle time data, shovel positions'
Red flags to identify: Gaps in sensor data, inconsistent equipment ID naming across systems, missing failure labels, paper-based records not yet digitized.
Week 2: Vendor Shortlist & Proof-of-Concept Design
Days 8-11: Vendor Landscape
Tier your options:
- Mining-specific AI vendors: Maptek, Mineware, Wenco, Hexagon Mining — deep domain knowledge, faster time-to-value, higher licensing cost
- Industrial IoT platforms: GE Vernova Predix, Siemens MindSphere, PTC ThingWorx — horizontal platforms, need mining customization
- Cloud AI + in-house build: AWS SageMaker, Azure Machine Learning, Google Vertex AI — maximum flexibility, requires ML talent
Days 12-14: Proof-of-Concept Scoping
Define your PoC with hard success criteria before vendor negotiations:
PoC Scope Document Template:
- Business objective: [e.g., reduce truck cycle time variance by 15%]
- Data to be used: [e.g., 18 months dispatch data, 500 truck GPS records]
- Duration: 8 weeks
- Success metric: [e.g., cycle time CV < 12% vs baseline 14%]
- Resources: 0.5 FTE data engineer, 0.25 FTE mining engineer for validation
- Go/no-go criteria: Must show 10%+ improvement on held-out test period
Week 3: Infrastructure & Integration Sprint
Days 15-19: Data Pipeline Setup
This is where most mining AI projects stall — focus aggressively:
# Typical integration stack for a mining AI pilot
from minesite_connector import FMSConnector, CMSConnector
# Connect to Dispatch (Fleet Management System)
fms = FMSConnector(system='Wenco', host='mine-fms-server')
cycle_data = fms.pull_cycles(start='2023-01-01', equipment=['TR001-TR050'])
# Connect to Maintenance (CMMS)
cms = CMSConnector(system='SAP PM', host='mine-sap-server')
work_orders = cms.pull_work_orders(equipment=cycle_data.equipment_ids)
# Join and clean
merged = merge_fms_cms(cycle_data, work_orders, on='equipment_id')
cleaned = remove_outliers(merged, method='iqr', columns=['cycle_time'])
# Send to ML platform
platform.upload_dataset(cleaned, name='dispatch_pilot_v1')
Days 20-21: Model Training & Validation
Split data strictly by time (not random) — this is critical for operational AI:
- Training: first 70% of time period
- Validation: next 15%
- Test (hold-out): last 15% — only look at this once
Week 4: Deploy, Measure & Plan Scale-Up
Days 22-26: Shadow Mode Deployment
Run the AI recommendation system alongside existing operations without acting on its outputs. This is critical for:
- Operator trust building
- Catching edge cases the model hasn't seen
- Collecting feedback from experienced operators
- Identifying data quality issues in production
Days 27-30: Go/No-Go Review & Scale-Up Proposal
Prepare a business case with three scenarios:
| Scenario | Investment | Annual Benefit | Payback |
|---|---|---|---|
| Conservative (50% of PoC gain) | $2M | $3.5M | 7 months |
| Expected (PoC gain sustained) | $2M | $7M | 3.4 months |
| Optimistic (system learning improves) | $3M | $12M | 3 months |
Key Takeaways
- •Start with a single high-pain use case — unplanned downtime, ore variability, or cycle time
- •Data audit in week 1 is non-negotiable; most pilots fail due to data quality not AI quality
- •Always split time-series data chronologically (not randomly) to avoid leakage in validation
- •Run shadow mode for 2+ weeks before acting on AI recommendations to build operator trust