AI Model Wiki

    Skip to main content
    20 min
    Lesson 5 of 6

    30-Day AI Mining Implementation Plan

    From the course AI for Mining & Resources

    A structured four-week roadmap to move from AI awareness to a working pilot in your mining operation.

    Week 1: Discovery & Data Audit

    Days 1-3: Stakeholder Alignment

    Start with a cross-functional workshop involving operations, maintenance, geology, safety, and IT. Define the single biggest operational pain point — this becomes your pilot focus. Common high-value starting points:

    • Unplanned equipment downtime (maintenance teams love this)
    • Ore grade variability causing process instability (metallurgy wins)
    • Truck cycle time variance (production supervisors' priority)
    • Safety incident precursors (HSE buy-in is critical)

    Days 4-7: Data Inventory

    Audit what data you actually have and its quality:

    # Data readiness checklist
    data_sources = {
        'dispatch_system': {'years': 5, 'completeness': '95%', 'format': 'SQL'},
        'maintenance_cmms': {'years': 8, 'completeness': '78%', 'format': 'SAP'},
        'process_historian': {'years': 3, 'completeness': '99%', 'format': 'OSIsoft PI'},
        'drill_data': {'years': 2, 'completeness': '60%', 'format': 'CSV'},
        'lab_assays': {'years': 15, 'completeness': '92%', 'format': 'LIMS'}
    }
    
    # Minimum viable dataset for each use case
    predictive_maintenance_minimum = '2 years, 80%+ completeness, failure events labeled'
    grade_prediction_minimum = '500+ drill holes with assays, geology logs'
    dispatch_optimization_minimum = '6 months cycle time data, shovel positions'
    

    Red flags to identify: Gaps in sensor data, inconsistent equipment ID naming across systems, missing failure labels, paper-based records not yet digitized.

    Week 2: Vendor Shortlist & Proof-of-Concept Design

    Days 8-11: Vendor Landscape

    Tier your options:

    • Mining-specific AI vendors: Maptek, Mineware, Wenco, Hexagon Mining — deep domain knowledge, faster time-to-value, higher licensing cost
    • Industrial IoT platforms: GE Vernova Predix, Siemens MindSphere, PTC ThingWorx — horizontal platforms, need mining customization
    • Cloud AI + in-house build: AWS SageMaker, Azure Machine Learning, Google Vertex AI — maximum flexibility, requires ML talent

    Days 12-14: Proof-of-Concept Scoping

    Define your PoC with hard success criteria before vendor negotiations:

    PoC Scope Document Template:
    - Business objective: [e.g., reduce truck cycle time variance by 15%]
    - Data to be used: [e.g., 18 months dispatch data, 500 truck GPS records]
    - Duration: 8 weeks
    - Success metric: [e.g., cycle time CV < 12% vs baseline 14%]
    - Resources: 0.5 FTE data engineer, 0.25 FTE mining engineer for validation
    - Go/no-go criteria: Must show 10%+ improvement on held-out test period
    

    Week 3: Infrastructure & Integration Sprint

    Days 15-19: Data Pipeline Setup

    This is where most mining AI projects stall — focus aggressively:

    # Typical integration stack for a mining AI pilot
    from minesite_connector import FMSConnector, CMSConnector
    
    # Connect to Dispatch (Fleet Management System)
    fms = FMSConnector(system='Wenco', host='mine-fms-server')
    cycle_data = fms.pull_cycles(start='2023-01-01', equipment=['TR001-TR050'])
    
    # Connect to Maintenance (CMMS)
    cms = CMSConnector(system='SAP PM', host='mine-sap-server')
    work_orders = cms.pull_work_orders(equipment=cycle_data.equipment_ids)
    
    # Join and clean
    merged = merge_fms_cms(cycle_data, work_orders, on='equipment_id')
    cleaned = remove_outliers(merged, method='iqr', columns=['cycle_time'])
    
    # Send to ML platform
    platform.upload_dataset(cleaned, name='dispatch_pilot_v1')
    

    Days 20-21: Model Training & Validation

    Split data strictly by time (not random) — this is critical for operational AI:

    • Training: first 70% of time period
    • Validation: next 15%
    • Test (hold-out): last 15% — only look at this once

    Week 4: Deploy, Measure & Plan Scale-Up

    Days 22-26: Shadow Mode Deployment

    Run the AI recommendation system alongside existing operations without acting on its outputs. This is critical for:

    • Operator trust building
    • Catching edge cases the model hasn't seen
    • Collecting feedback from experienced operators
    • Identifying data quality issues in production

    Days 27-30: Go/No-Go Review & Scale-Up Proposal

    Prepare a business case with three scenarios:

    ScenarioInvestmentAnnual BenefitPayback
    Conservative (50% of PoC gain)$2M$3.5M7 months
    Expected (PoC gain sustained)$2M$7M3.4 months
    Optimistic (system learning improves)$3M$12M3 months

    Key Takeaways

    • •Start with a single high-pain use case — unplanned downtime, ore variability, or cycle time
    • •Data audit in week 1 is non-negotiable; most pilots fail due to data quality not AI quality
    • •Always split time-series data chronologically (not randomly) to avoid leakage in validation
    • •Run shadow mode for 2+ weeks before acting on AI recommendations to build operator trust
    0 of 6 lessons marked complete

    Progress is kept in this browser only.